Synopsis: The s(n) Program
Date: 2026-10-01
Status: Living document, revised whenever a result lands.
Owns: The single technical account of what this project knows, how it knows it, and what it is doing next.
Evidence cutoff: Includes the independently audited T-060 global proof replay of 2026-09-30 and Session 165’s certified upper endpoint of 2026-10-01. Earlier record-state and validation revisions are retained in Session 128.
Every number here also appears in a schema-validated artifact in this repository, or is reproducible by a command given in the text, and the artifact is authoritative where the two differ.
devtools.check_synopsisenforces that in the gate.
The research synopsis is organized in chapters. A link to an earlier section lands on its chapter below; open the chapter to read the section.
- The Program at a Glance
- The Program at a Glance: Current research readiness
- The Program at a Glance: Document Map
- The Program at a Glance: Refresh rule
- The Program at a Glance: Research Program Status and Roadmap
- The Program at a Glance: Results and their significance
- The Program at a Glance: The Program at a Glance
- Workflow Entry Contracts
- Workflow Entry Contracts: Current Handoff
- Workflow Entry Contracts: Previous n11 Intake and Verification
- Workflow Entry Contracts: Previous: Session 165 Post-optimality Overnight
- Workflow Entry Contracts: Previous: Session 166 n17 Route Review
- Workflow Entry Contracts: Result Import and Efficient Confirmation
- Workflow Entry Contracts: Session 168: Families, the T-007 Correction and T-087
- Workflow Entry Contracts: Session 169: One Record per Line for Retained Results
- Workflow Entry Contracts: Switching Workflows in One Session
- Workflow Entry Contracts: Workflow Entry Contracts
- Handoff Record
- Handoff Record: Earlier Handoffs
- Handoff Record: Handoff Record
- Handoff Record: September 10–13
- What Is Built
- What Is Built: Compiled acceleration—unbuilt, deliberately
- What Is Built: Reading the gate
- What Is Built: The exact layer—built
- What Is Built: The map layer—built, not admissible
- What Is Built: The promotion pipeline—built end to end, with the promotion itself withheld
- What Is Built: The proof lane—built and producing theorems
- What Is Built: The proposer layer—one instrument, and the interface is unbuilt
- What Is Built: The refinement layer—built, with a floor
- What Is Built: Verification Capability Ladder
- What Is Built: What Is Built
- Terminology
- Terminology: Assurance, Methods, and Claims
- Terminology: Identifiers and Control Records
- Terminology: Not used here
- Terminology: Terminology
- Terminology: The deliverables, and what each one currently is
- Terminology: The measurements
- Terminology: The objects
- Terminology: The operations
- Terminology: The weighted-certificate objects
- Terminology: Work Units and Records
- The Problem
- The Problem: The Problem
- The Problem: Why exactness is not optional
- The Lay of the Land, by n
- The Lay of the Land, by n: The Lay of the Land, by n
- n = 11, End to End
- n = 11, End to End: After the intake: explorations, reviews, and the settlement ladder
- n = 11, End to End: Identified but not pursued
- n = 11, End to End: n = 11, End to End
- n = 11, End to End: The exact n = 11 result
- n = 11, End to End: The first-party ladder, and where it stopped
- n = 11, End to End: What a proof has to do
- n = 11, End to End: What the external intake changed
- n = 11, End to End: What worked and what did not
- Theoretical Results
- Theoretical Results: Results established here
- Theoretical Results: Results relied on from the literature
- Theoretical Results: Theoretical Results
- The Cell Decomposition
- The Cell Decomposition: A cell is not a basin, and this trap has been walked into
- The Cell Decomposition: Nor does a point-basin classify a flat terminal component
- The Cell Decomposition: Setup
- The Cell Decomposition: Statement
- The Cell Decomposition: The Cell Decomposition
- The Cell Decomposition: The instance: Trump’s cell
- The Cell Decomposition: Thirty-four dimensions become one
- The Cell Decomposition: Two implementations, on purpose
- The Cell Decomposition: What “exact” does and does not mean here
- The Cell Decomposition: Why
- The Corner, and the Method It Forced
- The Corner, and the Method It Forced: And what it did not buy
- The Corner, and the Method It Forced: Other consequences
- The Corner, and the Method It Forced: Reproducing all of it
- The Corner, and the Method It Forced: The Corner, and the Method It Forced
- The Corner, and the Method It Forced: The measurement
- The Corner, and the Method It Forced: The mechanism
- The Corner, and the Method It Forced: The method, and what it bought
- The Corner, and the Method It Forced: The prediction, and what it cost to ignore
- The Program So Far
- The Program So Far: How rounds are run
- The Program So Far: The Program So Far
- The Hypothesis Registry
- The Hypothesis Registry: Blocked, and on what
- The Hypothesis Registry: Confirmed
- The Hypothesis Registry: Refuted, and what each refutation bought
- The Hypothesis Registry: The Hypothesis Registry
- Sessions Conducted
- Sessions Conducted: Sessions Conducted
- Experiments Conducted
- Experiments Conducted: Cost and provenance
- Experiments Conducted: Experiments Conducted
- Experiments Conducted: Known defects in the record
- Experiments Conducted: Roll-up
- Experiments Conducted: What the 246 rounds jointly establish
- The Defect Record
- The Defect Record: The Defect Record
- Where This Stands
- Where This Stands: Where This Stands
- References
- References: References